Supply and Demand Analysis Indian Broken Rice 21-Oct-2026
EBP Demand
  • OMCs have invited bids for 11 billion litres of ethanol for the Ethanol Supply Year (ESY) 2026-27, from the 10.50 billion litres sought in the previous year’s first-cycle tender.
  • The tender allows ethanol from maize, FCI surplus rice, damaged food grains, C-heavy molasses and other eligible feedstocks such as cassava, sweet sorghum and sugar beet under the National Policy on Biofuels (NPB 2022). However, sugarcane juice/syrup and B-heavy molasses have been excluded, with the government restricting sugar diversion for ethanol production to zero.
  • The effective procurement price for maize-based ethanol has been reduced by ₹3/litre, from ₹71.86 to ₹68.86. The basic price remains ₹66.07/litre, but the incentive has been cut from ₹5.79 to ₹2.79/litre. In comparison, the procurement prices for C-heavy molasses, FCI surplus rice and damaged food grains remain unchanged at ₹57.97, ₹60.32 and ₹64/litre, respectively. Other eligible non-petroleum feedstocks have been introduced as a new category at ₹57.97/litre.
  • The key change for 2026-27 ESY is that OMCs will fill the ethanol requirement by moving through feedstock categories in ascending order of ex-mill procurement price. Within each category, allocation is made on a pro-rata basis, subject to applicable limits and bidder preferences. The merit order for the remaining requirement is:
    • C-heavy molasses and other eligible NPB feedstocks: ₹57.97/litre
    • FCI surplus rice: ₹60.32/litre, capped at 1.08 Billion litres per quarter in Q1–Q3
    • Damaged food grains, including broken rice: ₹64/litre
    • Maize: ₹68.86/litre, allocated against the remaining requirement
  • Cooperative sugar mills (CSMs) and dedicated ethanol plants (DEPs) with long-term offtake agreements receive priority consideration for their contracted quantities, with the cheapest feedstock considered first. Dedicated ethanol plants covered under the first Expression of Interest (EOI-1) also receive preference up to their design capacity, on a best-efforts basis. After these priority quantities and cheaper feedstock categories are considered, the remaining requirement is allocated to eligible offers in the applicable price order.